Life extension & refurbishment

Refurbishment adds 30+ years of safe operation to CANDU reactors — at a fraction of the cost of new generation.

30+ yrs

added operation

~$26B

Ontario refurb investment

19

CANDU reactors in Ontario

30M t

emissions avoided by 2030

Why refurbish

CANDU reactors are designed so their core components — pressure tubes, calandria tubes and feeders — can be replaced. Refurbishment returns a unit to near-new condition and extends its life by decades.

Ontario's refurbishment programmes at Darlington and Bruce Power are among the largest clean energy projects in North America.

Our scope

We provide engineering, retube and feeder replacement (RFR) tooling, steam generator work, safety analysis, licensing documentation and project management.

Completed and ongoing work includes Point Lepreau (Canada), Wolsong 1 (South Korea), Embalse (Argentina) and Darlington and Bruce units in Ontario, with Cernavoda 1 (Romania) under way.

Delivering value

Refurbishment protects jobs, preserves low-carbon baseload generation and makes use of existing sites, grid connections and skilled workforces.

Read more: Helping Ontario achieve net zero

Powering the next century of clean, reliable energy.