What we do
Life extension & refurbishment
Refurbishment adds 30+ years of safe operation to CANDU reactors — at a fraction of the cost of new generation.
30+ yrs
added operation
~$26B
Ontario refurb investment
19
CANDU reactors in Ontario
30M t
emissions avoided by 2030
Why refurbish
CANDU reactors are designed so their core components — pressure tubes, calandria tubes and feeders — can be replaced. Refurbishment returns a unit to near-new condition and extends its life by decades.
Ontario's refurbishment programmes at Darlington and Bruce Power are among the largest clean energy projects in North America.
Our scope
We provide engineering, retube and feeder replacement (RFR) tooling, steam generator work, safety analysis, licensing documentation and project management.
Completed and ongoing work includes Point Lepreau (Canada), Wolsong 1 (South Korea), Embalse (Argentina) and Darlington and Bruce units in Ontario, with Cernavoda 1 (Romania) under way.
Delivering value
Refurbishment protects jobs, preserves low-carbon baseload generation and makes use of existing sites, grid connections and skilled workforces.